← Back to dashboard

Chulliar

Palakkad district · Irrigation · Chulliar basin

Storage

Water level

FRL 143.26 m (470.0 ft)

Spillway release

Latest report

Rain forecast

6 mm

Next 72h 21 mm

Storage & water level — last 30 days

Risk breakdown

Flood risk1
Landslide risk12
Reservoir stress0
Watershed saturation4
River overflow1
  • All monitored indicators within normal operating range

Rule curve — seasonal operating target

No rule curve (seasonal guide curve) is published for Chulliar in a form this platform can verify, so none is shown. Where an operating curve is published — as for Idukki after the 2018 floods — it is plotted against actual storage instead of being estimated.

Rainfall forecast — next 48 hours

Spillway releases

Current weather at the dam

Temperature
23.9°C
Humidity
88%
Rain 24h
3.5 mm
Wind
20 km/h
Gusts
37 km/h
Pressure
990 hPa

AI analysis

An AI analysis for this reservoir will appear after the next scheduled briefing.

Reservoir information bulletin

Commissioned
Dam type
Height
Length
Gross capacity
9.0 MCM
Live capacity
9.0 MCM
Catchment area
Full reservoir level
143.26 m (470.0 ft)
Power station
Installed capacity
Purpose
Operator
Irrigation
River
Chulliar
Basin
Bharathapuzha
Nearby towns
Chittur
Emergency contact
1077