← Back to dashboard

Kakki (Anathode)

Pathanamthitta district · KSEB · Kakki basin · report 04 Aug 2026, 14:00 IST

Storage

50.8%

Previous 50.6%

Water level

965.10 m (3166.3 ft)

FRL 981.46 m (3220.0 ft)

Spillway release

Latest report

Rain forecast

22 mm

Next 72h 60 mm

Storage & water level — last 30 days

Risk breakdown

Flood risk31
Landslide risk31
Reservoir stress44
Watershed saturation30
River overflow14
  • All monitored indicators within normal operating range

Rule curve — seasonal operating target

No rule curve (seasonal guide curve) is published for Kakki (Anathode) in a form this platform can verify, so none is shown. Where an operating curve is published — as for Idukki after the 2018 floods — it is plotted against actual storage instead of being estimated.

Rainfall forecast — next 48 hours

Spillway releases

Current weather at the dam

Temperature
19.0°C
Humidity
99%
Rain 24h
57.3 mm
Wind
5 km/h
Gusts
28 km/h
Pressure
907 hPa

AI analysis

At 10:00 PM, Kakki (Anathode) is at red alert with 44.82% storage and a water level of 962.06 m, 18.94 m below the 981 m FRL; there is currently no spill. The alert is being driven by 37.4 mm of rain in the past 24 hours, with another 60.9 mm forecast in 24 hours and 80 mm over 72 hours, alongside a flood-risk score of 48 and landslide-risk score of 29; the next alert level would be triggered when the reservoir reaches its specified higher water-level threshold, which was not provided.

  • Danger alert — Kakki (Anathode) · 03 Aug 2026, 10:14 IST

Reservoir information bulletin

Commissioned
1966
Dam type
Masonry gravity
Height
115.1 m (377.5 ft)
Length
Gross capacity
454.0 MCM
Live capacity
454.0 MCM
Catchment area
220 km²
Full reservoir level
981.46 m (3220.0 ft)
Power station
Sabarigiri (Moozhiyar)
Installed capacity
340.0 MW
Purpose
Hydroelectric
Operator
KSEB
River
Kakki
Basin
Pamba
Nearby towns
Seethathodu, Ranni
Emergency contact
1077 / 0468-2222515

Kakki, with the adjoining Anathode dam, impounds the Kakki reservoir on the Pamba river and supplies the 340 MW Sabarigiri scheme at Moozhiyar, commissioned in 1966.