Pothundi

Palakkad district · Irrigation · Ayalurpuzha basin · report 04 Aug 2026, 11:00 IST

Storage

45.0%

Previous 42.0%

Water level

100.25 m (328.9 ft)

FRL 108.20 m (355.0 ft)

Spillway release

0.2 cumecs

Latest report

Rain forecast

10 mm

Next 72h 30 mm

Storage & water level — last 30 days

Risk breakdown

Flood risk23
Landslide risk14
Reservoir stress47
Watershed saturation6
River overflow10
  • Controlled outflow of 0.24 cumecs (gates not reported open)

Rule curve — seasonal operating target

No rule curve (seasonal guide curve) is published for Pothundi in a form this platform can verify, so none is shown. Where an operating curve is published — as for Idukki after the 2018 floods — it is plotted against actual storage instead of being estimated.

Rainfall forecast — next 48 hours

Spillway releases

Current weather at the dam

Temperature
17.0°C
Humidity
100%
Rain 24h
5.1 mm
Wind
8 km/h
Gusts
37 km/h
Pressure
874 hPa

AI analysis

An AI analysis for this reservoir will appear after the next scheduled briefing.

  • Danger alert — Pothundi · 03 Aug 2026, 10:13 IST

Reservoir information bulletin

Commissioned
Dam type
Height
Length
Gross capacity
35.0 MCM
Live capacity
35.0 MCM
Catchment area
Full reservoir level
108.20 m (355.0 ft)
Power station
Installed capacity
Purpose
Operator
Irrigation
River
Ayalurpuzha
Basin
Bharathapuzha
Nearby towns
Nemmara
Emergency contact
1077