Sholayar

Thrissur district · KSEB · Chalakudy basin · report 01 Nov 2026, 11:00 IST

No warning — below every published alert level
Sholayar dam and reservoir
Photo: Wikimedia Commons

Storage

87.6%

Previous 87.9%

Water level

809.61 m (2656.2 ft)

FRL 811.68 m (2663.0 ft)

Spillway release

—

Latest report

Rain forecast

17 mm

Next 72h 46 mm

Storage & water level — last 30 days

Risk breakdown

Flood risk36
Landslide risk10
Reservoir stress74
Watershed saturation7
River overflow16
  • • Only 2.07 m of freeboard left below FRL
  • • Level 809.61 m is below the blue alert level of 810.16 m

Rate of rise(derived)

-0.20 ft / 24 h

Downstream exposure

Chalakudy river below Poringalkuthu through Athirappilly and Vazhachal to Chalakudy town

Local bodies on this reach: Athirappilly, Pariyaram, Koratty, Chalakudy, Annamanada

District control room: 1077 / 0487-2362424

Rule curve — seasonal operating target

No rule curve (seasonal guide curve) is published for Sholayar in a form this platform can verify, so none is shown. Where an operating curve is published — as for Idukki after the 2018 floods — it is plotted against actual storage instead of being estimated.

Rainfall forecast — next 48 hours

Spillway releases

Current weather at the dam

Temperature
20.1°C
Humidity
99%
Rain 24h
1.4 mm
Wind
1 km/h
Gusts
10 km/h
Pressure
915 hPa

AI analysis

Sholayar is at 88.79% storage, up slightly from 88.45%, with the water level at 809.823 m—1.859 m below the 811.682 m FRL—and no spill. Light recent rain of 1.4 mm and forecasts of 16.9 mm in 24 hours and 45.6 mm over 72 hours may drive further rises; the next alert would be triggered when the reservoir reaches its designated alert-level threshold, which is not provided.

  • Danger alert — Sholayar · 03 Aug 2026, 10:14 IST

Environmental & carbon accounting

Insufficient data
Reservoir methane (gross)
1,169 t CO₂e /yr

CH₄ from flooded land × GWP-100 (27), age-adjusted

Green carbon — catchment forest
Not enough data /yr

Western Ghats forest sink, 60% forest cover assumed

Blue carbon — sediment burial
307 t CO₂e /yr

≈ 307 indicative credits/yr

Hydropower grid offset
1,18,544 t CO₂e /yr

vs CEA grid 0.716 kg CO₂/kWh, 35% capacity factor

Net catchment balance: Not enough data/yr (forest + sediment sinks minus reservoir methane)

Estimate, not a measurement — built from IPCC 2019 Flooded Lands factors and public dam data. Kerala does not publish measured reservoir emissions. Credits shown are indicative, not registered. How this is calculated

Reservoir information bulletin

Commissioned
1966
Dam type
Concrete gravity
Height
—
Length
—
Gross capacity
153.5 MCM
Live capacity
153.5 MCM
Catchment area
—
Full reservoir level
811.68 m (2663.0 ft)
Power station
Sholayar HEP
Installed capacity
54.0 MW
Purpose
Hydroelectric
Operator
KSEB
River
Chalakudy
Basin
Chalakudy
Nearby towns
Athirappilly, Chalakudy
Emergency contact
1077 / 0487-2362424

Kerala Sholayar on the Chalakudy river adjoins the Tamil Nadu Sholayar reservoir and feeds a 54 MW powerhouse; its releases flow down to Poringalkuthu.

Chalakudy river system — levels & flow

Every monitored structure on this river, ordered by how much water it is passing downstream right now.

StructureLevel / FRL (m)StorageInflowOutflowStatus
SholayarThrissur809.61 / 811.682656.2 ft / 2663.0 ft87.6%——No warning — below every published alert level
PoringalkuthuThrissur416.50 / 423.981366.5 ft / 1391.0 ft39.9%——No warning — below every published alert level