Palakkad district · Irrigation · Walayar basin · report 01 Nov 2026, 11:00 IST
Storage
15.0%
Previous 15.0%
Water level
196.32 m (644.1 ft)
FRL 203.00 m (666.0 ft)
Spillway release
0.0 cumecs
Latest report
Rain forecast
3 mm
Next 72h 13 mm
Rate of rise(derived)
0.00 m / 24 h
Downstream exposure
The downstream reach and local body list for Walayar have not been transcribed from a District Disaster Management Plan yet, so none are shown.
District control room: 1077 / 0491-2505309
No rule curve (seasonal guide curve) is published for Walayar in a form this platform can verify, so none is shown. Where an operating curve is published — as for Idukki after the 2018 floods — it is plotted against actual storage instead of being estimated.
An AI analysis for this reservoir will appear after the next scheduled briefing.
CH₄ from flooded land × GWP-100 (27), age-adjusted
Western Ghats forest sink, 60% forest cover assumed
≈ 42 indicative credits/yr
vs CEA grid 0.716 kg CO₂/kWh, 35% capacity factor
Net catchment balance: Not enough data/yr (forest + sediment sinks minus reservoir methane)
Estimate, not a measurement — built from IPCC 2019 Flooded Lands factors and public dam data. Kerala does not publish measured reservoir emissions. Credits shown are indicative, not registered. How this is calculated