Meenkara

Palakkad district · Irrigation · Gayathripuzha basin · report 18 Sep 2026, 11:00 IST

Controlled release — water is being released in regulated quantities, not a danger warning

Storage

22.0%

Previous 24.0%

Water level

152.00 m (498.7 ft)

FRL 156.36 m (513.0 ft)

Spillway release

2.7 cumecs

Latest report

Rain forecast

5 mm

Next 72h 23 mm

Storage & water level — last 30 days

Risk breakdown

Flood risk10
Landslide risk13
Reservoir stress19
Watershed saturation7
River overflow5
  • Releasing 2.67 cumecs — controlled release
  • Controlled outflow of 2.67 cumecs (gates not reported open)

Rate of rise(derived)

-0.19 m / 24 h

Downstream exposure

The downstream reach and local body list for Meenkara have not been transcribed from a District Disaster Management Plan yet, so none are shown.

District control room: 1077 / 0491-2505309

Rule curve — seasonal operating target

No rule curve (seasonal guide curve) is published for Meenkara in a form this platform can verify, so none is shown. Where an operating curve is published — as for Idukki after the 2018 floods — it is plotted against actual storage instead of being estimated.

Rainfall forecast — next 48 hours

Spillway releases

Current weather at the dam

Temperature
27.9°C
Humidity
70%
Rain 24h
8.7 mm
Wind
15 km/h
Gusts
31 km/h
Pressure
990 hPa

AI analysis

Meenkara is at red alert, with storage steady at 16% and the water level at 151.49 m, just 0.30 m below the 151.79 m FRL; there is currently no spill. Recent rain of 19.4 mm is the main driver, while the forecast is lower at 3.4 mm in 24 hours and 16.5 mm in 72 hours; the next escalation would be triggered if the level reaches FRL and spilling begins, especially if flood risk rises from 39.

  • Controlled release alert — Meenkara · 15 Sep 2026, 11:37 IST
  • Controlled release alert — Meenkara · 11 Sep 2026, 11:37 IST
  • Danger alert — Meenkara · 03 Aug 2026, 22:15 IST
  • Danger alert — Meenkara · 03 Aug 2026, 11:37 IST
  • Warning alert — Meenkara · 03 Aug 2026, 10:19 IST

Reservoir information bulletin

Commissioned
Dam type
Height
Length
Gross capacity
14.0 MCM
Live capacity
14.0 MCM
Catchment area
Full reservoir level
156.36 m (513.0 ft)
Power station
Installed capacity
Purpose
Operator
Irrigation
River
Gayathripuzha
Basin
Bharathapuzha
Nearby towns
Chittur
Emergency contact
1077

Gayathripuzha river system — levels & flow

Every monitored structure on this river, ordered by how much water it is passing downstream right now.

StructureLevel / FRL (m)StorageInflowOutflowStatus
Moolathara (Regulator)Palakkad181.55 / 184.70595.6 ft / 606.0 ft9 m³/sControlled release — water is being released in regulated quantities, not a danger warning
MeenkaraPalakkad152.00 / 156.36498.7 ft / 513.0 ft22.0%3 m³/sControlled release — water is being released in regulated quantities, not a danger warning
ChulliyarPalakkad145.92 / 154.08478.7 ft / 505.5 ft19.0%2 m³/sControlled release — water is being released in regulated quantities, not a danger warning