Palakkad district · Irrigation · Gayathripuzha basin · report 18 Sep 2026, 11:00 IST
Storage
—
Water level
181.55 m (595.6 ft)
FRL 184.70 m (606.0 ft)
Spillway release
8.7 cumecs
Latest report
Rain forecast
4 mm
Next 72h 26 mm
Rate of rise(derived)
0.00 m / 24 h
Downstream exposure
The downstream reach and local body list for Moolathara (Regulator) have not been transcribed from a District Disaster Management Plan yet, so none are shown.
District control room: 1077 / 0491-2505309
No rule curve (seasonal guide curve) is published for Moolathara (Regulator) in a form this platform can verify, so none is shown. Where an operating curve is published — as for Idukki after the 2018 floods — it is plotted against actual storage instead of being estimated.
An AI analysis for this reservoir will appear after the next scheduled briefing.
Every monitored structure on this river, ordered by how much water it is passing downstream right now.
| Structure | Level / FRL (m) | Storage | Inflow | Outflow | Status |
|---|---|---|---|---|---|
| Moolathara (Regulator)Palakkad | 181.55 / 184.70595.6 ft / 606.0 ft | — | — | 9 m³/s | Controlled release — water is being released in regulated quantities, not a danger warning |
| MeenkaraPalakkad | 152.00 / 156.36498.7 ft / 513.0 ft | 22.0% | — | 3 m³/s | Controlled release — water is being released in regulated quantities, not a danger warning |
| ChulliyarPalakkad | 145.92 / 154.08478.7 ft / 505.5 ft | 19.0% | — | 2 m³/s | Controlled release — water is being released in regulated quantities, not a danger warning |